Completed

Keystone Villas - Joy Engineering

Keystone Villas

Keystone Villas was a 240-unit multi-family development in Northwest Reno. Joy Engineering was contracted to complete all sitework and underground utilities. This project required over 100,000 cubic yards of export to an adjacent site. In addition, 1000 LF of precast block MSE walls and 2900 LF of rockery walls were constructed for this project by […]

Keystone Villas Read More »

TRIC 1030K - Joy Engineering

TRIC 1030K

TRIC shell buildings 1 & 2 was a mass grade project for Prologis at the Tahoe Reno Industrial Center consisting of a combined building square footage of 1.04 million. Joy Engineering moved over 300,000 cubic yards of material and crushed over 70,000 cy of on-site blasted rock via a mobile crushing operation. Joy engineering put

TRIC 1030K Read More »

COMMERCIAL-WEBSTAURANT-AFTER - Joy Engineering

Webstaurant

BEFORE AFTER https://joyengineering.com/wp-content/uploads/2023/11/COMMERCIAL-WEBSTAURANT-01.mp4 Webstaurant was a commercial 620,000 sf building constructed for an online restaurant supply distributor. Joy Engineering was hired to complete all sitework and underground utilities. Joy Engineering moved over 250,000 cy of material and placed over 50,000 tons of rip rap in order to realign an existing ditch.  LOCATION: DAYTON, NEVADACOMPLETION: 2021

Webstaurant Read More »

TRIC Pittsburgh - Joy Engineering

TRIC Pittsburgh

TRIC Pittsburgh was a commercial shell building of 490,000 sf constructed at the Tahoe-Reno Industrial Center which Joy Engineering was hired to complete all sitework and underground utilities. Due to shallow bedrock, Joy Engineering mobilized blasting crews and a mobile crushing operation to utilize all onsite blasted rock from excavation and utility trenching. LOCATION: SPARKS,

TRIC Pittsburgh Read More »